Kitchen

  • Location: Bramhall
  • Installed in: 2015
  • Timescale: 1 week and 3 days

Details:

The before photos show the difference between the old and new design. We completely transformed this kitchen utilising the same carcasses, we replaced the doors with Ivory doors and all the pelmets, cornice, filler panels and damaged plinths. We changed the location of appliances and installed a new larder unit to house a fridge/freezer. We also adapted some of the top cupboards so that they are at the same height instead of having the old different height feature. We replaced the worktops, re-tiled, fitted a new floor and installed many new appliances including the oven, hob and extractor. A subtle difference of raising the height of the windowsill allowed for better tiling and less plastic on show from the window. The entire kitchen has cleaner lines and the new ceiling and LED lights makes the room brighter and more practical. An amazing transformation.

Other projects completed for this customer:

Bathroom.

Customer comment:

“We would like to thank Philip, Keane and Craig for the excellent work on our kitchen. We are so pleased with the kitchen installation”.
Mr & Mrs Chadwick, Bramhall 2015