Shower room

  • Location: Denton
  • Installed in: 2014
  • Timescale: 2 weeks

Details:

We removed a bath and replaced to make a shower room with quadrant shower, and a run of tiled surface to hide a concealed toilet cistern, pipework and to create storage under the basin.

Customer comment:

“Very satisfied with the end result. Tim listened to and used my ideas and his technical know how to achieve this end. Craig and George worked hard, were very thoughtful, left us as tidy as possible each evening and cleaned up perfectly on the last day. Preparatory discussion and follow up by Tim ensured that all questions were answered”
Ms Robinson, Denton 2014