Shower room

  • Location: Greenfield, Saddleworth
  • Installed in: 2014
  • Timescale: 1 week and 4 days

Details:

The old bathroom had a bath where the shower tray is and a toilet and basin on the window wall. Our customer wanted to remove the bath and have a large shower area and ample storage space. We moved the soil pipe and the toilet and basin to create a feature wall of a run of finger pull door vanity cupboards to create a seamless look, topped off with beige quartz mirror sparkle worktops. A large bespoke mirror and ambient LED lighting above and underfloor heating all add to the luxury feel of the room. All topped off with precision tiling in Mineral Gold Sand.